05.29.24 – 06.10.24
06.06.24 – 06.09.24
06.08.24 – 06.14.24
06.15.24 – 06.16.24
Ultime Trimaran - Construction of Banque Populaire XI on the home straight
Friday, April 2, 2021
Banque Populaire is currently building a new Ultime trimaran in Lorient. The 32-metre foiling trimaran is due to be launched at the end of April, after which Armel Le Cléac'h FRA will continue to optimise the boat with intensive testing. The report (fr.).
09.06.2024 – »
Optimist - Team Race - Trofeo Rizzotti - Venice ITA - Day 2
09.06.2024 – »
O-Jolle - Euro-Cup 2024 - Flüelen SUI - Day 3